We came prepared for the next weekend. After the abject failure to secure all necessary units in person the week before, we'd decided to place an online order for the following week to ensure it actually all turned up. Happily it was another sunny warm spring weekend so much of the assembly was done outside. …
Month: April 2019
Kitchen Week 1
Morning arrived with a great disgorging of the car. The kitchen and utility were stripped of their plastic coverings and one last tile stuck down ready to be forever covered up with a cabinet. For now was the time to start filling the rooms up and to get creative with cabinetry. Happily flat pack is …
Load Star
With layouts and battle plans drawn up and the electrical work finally finished it was time to make our move. All the Ikea order numbers were meticulously itemised and researched ready for us to go in and order. Thus we set off on a Friday night for a supper of meatballs and flatpack. It started …